PlanHMin the studio
Water meter
Water meter places the point from which the water supply starts: a click on a wall puts it there, and once the phase has one, a click shifts it and the supply follows. Ctrl with a click adds another meter instead.
What it is
The water meter is where the water supply starts. Like the distribution board, its tool places it once and then shifts it: the first click on a wall places the meter, and every click after that shifts the meter of the phase you are drawing in to the wall you click. The supply follows at once, laid again from its new position. With Ctrl pressed, a click adds another meter.
Every cold and hot water point is supplied from the nearest manifold, or from the meter where there is no manifold, each by its own run. The meter is not in the list of the Plumbing tool: it has this tool of its own.
When to use it
- To place the water connection of a house.
- To shift it to another wall and see the supply laid again.
- To add a second meter for a second dwelling unit.
The steps
Pick the tool. Type
Hand thenMquickly, or pick it on the toolbar, where it shares one button with the other plumbing tools. The status bar tells you that a click on a wall moves the phase's meter there and that Ctrl with a click adds another one.
Click a wall. Click on the wall or within about 60 cm of it, on the face on which it should stand. If this phase has no meter yet, it is placed there. If it has one or more, the nearest one on this level moves there (the first one, if none stands on this level), and the supply follows.

Add another one with Ctrl. Keep
Ctrl(⌘on a Mac) pressed as you click: a new meter is placed.
What it refuses
- A click far from every wall. Farther than about 60 cm from any wall, nothing is placed or moved.
What it writes to the contract
One step, which one undo reverses. The first meter, and every meter added with Ctrl, adds one entry to the list of points: the water meter kind, its wall, its distance along it and its face, and its phase. A shift changes only the wall, the distance and the face of the meter that moved. The supply runs are never written: they are worked out every time the project is built.
Concepts
Common questions
Do I need a meter if I place a manifold?
The supply runs from the nearest manifold, or from the meter where there is none. The meter is where the water enters the house, so it is worth placing in either case.
How do I shift the meter?
Pick the Water meter tool and click the wall where it should stand. The meter moves there and the supply is laid again from it.