ARCHSPLACE
Architecture, made simple — since 2018
Schedules

Panels

Schedules

A schedule is a table that the atelier takes off the model: doors, windows, rooms and their areas, walls, slabs, footings, electrical points, wire, conduit, pipes, ducts and the other categories the project has. You choose what it lists, its columns, its sorting and its totals; it opens as a view of its own, goes on a sheet, and exports as CSV or XLSX.

What it is

The schedules are listed in the sidebar under Schedules, with New schedule, which makes a blank one, Schedule with a number, and opens it. Its Start from list then gives it the whole recipe of a starter: Doors and windows, Rooms and areas, Walls by type, Electrical devices, MCBs, Conduit and boxes, Wire take-off, Plumbing take-off or Ventilation take-off. A schedule opens as a view of its own: the table at its printed size, which pans and zooms. A click on a row selects its element; a right-click offers Show in drawing, which opens a view that draws it. A double-click on a cell lets you type into it. Its column edges, row edges, right edge and bottom edge are dragged to size it.

While a schedule is open, the column on the right is its builder, in sections:

  • Schedule: its Name, Start from, how many types and items it holds, and as chips the Levels it reads and the Phase, The view's by default.
  • What it lists: the categories of the take-off that the project has, each with its count, filtered by discipline chips, Architecture, Structure, Electrical, Plumbing, Ventilation & AC and Finishes, and a search when there are many.
  • Columns: the fields, ticked in or out and dragged into their order. The line of each column says how it reads, group by, its unit, each, sum or list, the wastage, and opens its own editor: its Heading, Width (mm), Decimals and Waste %.
  • Rows: Group by, Sort by field after field, each ascending or descending, and the Totals, per group and grand total.
  • On paper: the Row height (mm), the Widest (mm) and the Tallest (mm) it prints. Beyond the widest its columns narrow and their text wraps; beyond the tallest its rows continue alongside.

At its bottom stand Place on sheet, which offers each sheet and A new sheet, Export, which offers CSV and XLSX, and Request a quote….

When to use it

  • To list the doors and windows with their marks and sizes.
  • To take off quantities for a BOQ: wall areas by type, slab areas, footing volumes, wire by size, pipes by diameter.
  • To put a table on a sheet of the drawing set.
  • To send a list to a spreadsheet, or to a supplier.

The steps

  1. Start a schedule. In the sidebar, click New schedule under Schedules. Schedule 1 opens, with its builder on the right. In Start from, choose Doors and windows: the table lists every door and window.

    Start a schedule. In the sidebar, click New schedule under Schedules.
  2. Sort it. Under Rows, choose the width in Sort by. The doors and windows are listed by width.

    Sort it. Under Rows, choose the width in Sort by.
  3. Change a width. Double-click the width of a door in the table, type 0.9 and press Enter. The door itself is now 90 cm wide, in every view.

    Change a width. Double-click the width of a door in the table, type 0.9 and press Enter.
  4. Place it on a sheet. Click Place on sheet and choose a sheet. The schedule joins that sheet as a viewport.

    Place it on a sheet. Click Place on sheet and choose a sheet.
  5. Export it. Click Export, then XLSX. A toast tells you where the file went.

    Export it. Click Export, then XLSX.

What it refuses

  • A typed width or height that is not above zero, a negative sill, an unreadable number or a blank room name in a cell: it is no edit at all.
  • A widest or tallest below 20 mm. It is taken as 20.
  • Categories that the project does not have. They are not offered in What it lists.

What it writes to the contract

A schedule is a recipe in the schedules of the project, never its rows: its name, the categories it lists, its levels, its phase, its columns (each with its field and, when stated, its heading, width, decimals and sum), groupBy, sort, totals, waste, rowHeight, maxWidth, maxHeight and the starter it came from. The rows are taken off the model every time. A cell typed in writes either the value of the element itself, such as the width of an opening, or an entry of the overrides of the schedule. Every change is one step that one Ctrl+Z reverses. Export writes a file, never the contract.

Common questions

How do I make a door and window schedule?

In the sidebar, click New schedule under Schedules, then choose Doors and windows in Start from, in the builder on the right. The table lists every door and window with its mark and its size.

Can I change the width of a door from the schedule?

Yes. Double-click the cell and type the new width: the mark, width, height and sill of a door or a window, and the name and use of a room, are values of the model itself, so the element itself changes. Any other cell typed in becomes an override of the schedule, marked as such, which Back to the computed value removes.

How do I get a schedule into Excel?

Open the schedule and click Export in its builder, then XLSX, or CSV for any spreadsheet. File, Export this schedule… opens the same menu.