ARCHSPLACE
Architecture, made simple — since 2018
Distribution board

PlanEBin the studio

Distribution board

Distribution board places the board from which the circuits start: a click on a wall puts it there, and once the phase has one, a click shifts it and every circuit follows. Ctrl with a click adds another distribution board instead.

What it is

The distribution board is where the circuits start. Its tool is not a simple placement: the first click on a wall places the board, and every click after that shifts the board of the phase you are drawing in to the wall you click, instead of adding one more. The circuits follow at once, laid again from the new position of the board. With Ctrl pressed, a click adds another board instead.

The list beside the tools offers the board kinds of your template, such as a distribution board in a project under BIS, the Indian practice. The board is recessed into its wall as a cabinet. With more than one board, every point is fed by the nearest one along the path of the wire, unless its own panel names another, and every board numbers its circuits on its own.

When to use it

  • To place the board of a new installation, before or after the points.
  • To try the board in another place and see the circuits laid again from there.
  • To add a sub-distribution board, for example for a car parking or an upper floor.

The steps

  1. Pick the tool. Type E and then B quickly, or pick it on the toolbar, where it shares one button with Electrical. The status bar tells you that a click on a wall moves the phase's distribution board there and that Ctrl with a click adds another one.

    Pick the tool. Type E and then B quickly, or pick it on the toolbar, where it shares one button with Electrical.
  2. Choose the kind. Pick it from the list beside the tools, if your template offers more than one.

    Choose the kind. Pick it from the list beside the tools, if your template offers more than one.
  3. Click a wall. Click on the wall or within about 60 cm of it, on the face the board should face. If this phase has no board yet, it is placed there. If it has one or more, the nearest one on this level moves there (the first one, if none stands on this level), and the circuits follow.

    Click a wall. Click on the wall or within about 60 cm of it, on the face the board should face.
  4. Add another one with Ctrl. Keep Ctrl (⌘ on a Mac) pressed as you click: a new board is placed, and the boards share the points between them.

    Add another one with Ctrl. Keep Ctrl (⌘ on a Mac) pressed as you click: a new board is placed, and the boards share the points between them.

What it refuses

  • A click far from every wall. Farther than about 60 cm from any wall, nothing is placed or moved.
  • A point fed from something that is not a board. A point whose panel names anything other than a distribution board is refused by the project.

What it writes to the contract

One step, which one undo reverses. The first board, and every board added with Ctrl, adds one entry to the list of points: its kind, its wall, its distance along the wall and its face, and its phase. A shift changes only the wall, the distance and the face of the board that moved. The circuits are never written: they are worked out from the points and the boards every time the project is built.

Concepts

Common questions

How do I shift the distribution board?

Pick the Distribution board tool and click the wall where it should stand. The board moves there and every circuit is laid again from its new place.

Can a project have two distribution boards?

Yes. Keep Ctrl (Command on a Mac) pressed as you click to add another board. Every point is then fed by the board nearest along the path of the wire, unless you choose one in the panel of the point, and every board numbers its own circuits.